posted on 2025-09-12, 02:35authored bySiwen Cao, Hao Sun, Ziyu Tong
<p dir="ltr">Cao, S., Sun, H., & Tong, Z. (2025). BPMN-based building project lifecycle analysis with a core of BIM: Taking a campus project as an example. In <i>CAAD Futures 2025 -- Catalytic Interfaces: Conference Proceedings, Vol. I</i>, pp. 375--388. Hong Kong: University of Hong Kong. DOI: <a href="https://doi.org/10.25442/hku.29350142" rel="noreferrer" target="_blank">https://doi.org/10.25442/hku.29350142</a></p>