<p>The supplementary movies S1, S2, and S3 (presented in Figures 1 and 3) show typical debris flow, debris avalanche, and rock avalanche impacting a flexible ring net barrier with vint = 6 m/s, respectively.</p>
<p><br></p>
<p>These data are generated by desk computers in the lab and are about geophysical flows against a flexible ring net barrier. Tables 4, 5, 6, 7 and E1 provide original data for Figures 4, 5, 6, 7 and E1 in the paper, respectively.</p>
<p><br></p>
<p>The experimental data used for comparison in Figure 4b from the large-scale flume test V6-B1 with a flexible ring net barrier was published open access in the below article (Vicari <em>et al.,</em> 2021).</p>
<p><br></p>
<p>Vicari, H., Ng, C. W., Nordal, S., Thakur, V., De Silva, W. R. K., Liu, H., & Choi, C. E. (2021). The Effects of Upstream Flexible Barrier on the Debris Flow Entrainment and Impact Dynamics on a Terminal Barrier. Canadian Geotechnical Journal, 59(6), 1007-1019. https://doi.org/10.1139/cgj-2021-0119</p>
Funding
National Natural Science Foundation of China (Project #51909227)
The University Grants Council of Hong Kong (RGC/GRF Project #27202419)